Demand against capacity
- Now 480 vs capacity 504; in 12 weeks 528; shortfall 24; extra engineers 4.
Reporting and analytics
Each function counts things differently, so the leadership team argues about the numbers instead of the decisions.
Demonstration: Dunmore Building Services (fictional) · Construction services. Fictional data and a scripted answer.
If demand keeps rising, when will our repair backlog start to build, and how many engineers would stop it?
Change the assumptions. Every result and the answer below are recomputed from them, and a warning appears when a result crosses a stated limit.
In twelve weeks demand exceeds capacity, so a backlog builds and grows each week thereafter.
Simulated answer. Written for this fictional case, not produced by a live model. Only the figures in it are computed, from what you decided above.
Joining demand, staffing and visit rate shows what no single report shows: today the team keeps up with 480 requests, but with growth of 4 a week the gap opens [S1][S2]. Hiring 4 more engineers would close it at this rate.
The figure is a projection from a straight line. Seasonality, sickness and the time it takes to recruit and train an engineer all make the real picture less tidy.
Relies on: S1 · Repair requests per week, last yearS2 · Engineer headcount and visit rate
No approval is needed for this result: it is read-only insight, and nothing consequential happens because of it.